Works were performed at the pumping station "Petrovija" as part of works on improving the drainage and wastewater treatment system in the agglomeration of Umag-Savudrija for the client "6. Maj Odvodnja d.o.o. Umag”.The pumping station consists of an ultrasonic level meter, 2 pumps and accompanying automation equipment. As part of the works, the following was (or will be) performed:
Making grounding
Laying cables, cable ducts
Assembly and parameterization of ultrasonic lever transmitter
Production and installation of automation cabinet
Making of electrical diagrams
Development of PLC program and interface for local control via Siemens KP300 panel
Creation of a final project